North Access Hatchway
|
|
|
Most parts of the accelerator are just too big and heavy to carry downstairs by hand. Large equipment is driven into this building on the back of a truck, lifted by a crane attached to the ceiling and lowered down a hatch into the tunnel. You can see the closed hatch plates behind the handrail.
This page is maintained by Steve Gagnon.