South Linear Accelerator Tunnel Construction - March 1990
|
|
|
March 29, 1990: A view of the nearly completed South Linear Accelerator Tunnel in cross section. The vertical pipes protruding from the tunnel roof serve as conduits for cables and wave-guides from the LINAC Service Building which was later built above the tunnel.
|
This page is maintained by Steve Gagnon. |