Component List

5/8" diameter wood dowel (roughly 2 feet needed)

1 × 2 × 4' pine board (2 needed)

1 × 2 pine board (roughly 3 feet needed)

1 × 6 pine board (roughly 1 foot needed)

1/4" thick oak or poplar plywood (a section 4 feet long and 7 5/8" wide needed)

#6 × 3 3/8" screw hook (2 needed)

#6 × 1" wood screw (18 neded)

#8 × 2 1/2" wood screws (6 needed)

All of the components are gathered. All of the wood has been cut and all of the holes have been drilled.

All of the components are gathered. All of the wood has been cut
and all of the holes have been drilled.