Jefferson Lab's Workbench Projects

| List of Projects | Electromagnet Experiment Stand | Background | Overview | Component List | Base Construction |
| Magnet Support Frame Construction | Final Base Assembly | Coil Construction | Assembly | Operation |
| Point to Point Wiring Guide | Circuit Diagram | Download PDF |

Component List

28 gauge solid core, enameled magnet wire (200 feet needed)

toggle switch (DPDT, 15A, 2 needed)

momentary contact switch (SPST, normally open, 3A)

5/8" diameter hex bolt (5 3/8" long)

5/8" hex nuts (2 needed)

power supply (12 VDC, 3.33A output; 120 VAC input; 2.1 mm diameter output plug)

2.1 mm power jack (panel mount)

1 ohm, 10 Watt power resistors (3 needed)

5 ohm, 10 Watt power resistor

10 ohm, 10 Watt power resistor

470 ohm, 1/4 Watt resistors (3 needed)

green LEDs (T-20 package, 4 needed)

red LED (T-20 package)

24 gauge stranded hook-up wire (roughly 10 feet needed)

1 × 4 plank of white pine (roughly 3 feet needed)

1 × 2 plank of white pine (roughly 3 feet needed)

1/4" thick plywood (roughly 2 square feet needed)

3/16" diameter heat shrink (roughly 12 inches needed)

1" long 4d finishing nails (roughly 20 needed)

400 paper clips

1 small container

adhesive labels (Full Power, Half Power, 1000 Turns, 500 Turns and Power On)

adhesive felt feet (4 needed)

5 minute epoxy (3 packets needed)

wood glue

All of the components have been gathered. The wood for the base sections has been cut and holes for the hardware have been drilled.

All of the components have been gathered. The wood for the base sections
has been cut and holes for the hardware have been drilled.

| List of Projects | Electromagnet Experiment Stand | Background | Overview | Component List | Base Construction |
| Magnet Support Frame Construction | Final Base Assembly | Coil Construction | Assembly | Operation |
| Point to Point Wiring Guide | Circuit Diagram | Download PDF |