Jefferson Lab Site Tour
Administrative and Test Buildings

Applied Research Center

1st Floor

Conference Room

Library

User Lab

7th Floor

Check out the view!

Extras!

Construction Photo (08/95)

Construction Photo (10/96)

Construction Photo (10/97)

Ribbon Cutting Ceremony (05/98)

Governor Gilmore (05/98)

Library Space (09/98)

Empty 7th Floor (09/98)

CEBAF Center

1st Floor

Cafeteria

Cavity Display

CEBAF Center Auditorium

Eating Area

User/International Liaison Office

2nd Floor

Computer Center

Director's Office

Extras!

Construction Photo (10/88)

Experimental Equipment Laboratory

Detector Assembly

Calorimeter Assembly Area

Detector Assembly Clean Room

Drift Chamber Test Rig

Detector Storage Area

Residence Facility

The Great Room

A Guest Room

Test Lab

Cryomodule Assembly

Electron Beam Welder

Chemical Processing Room

Cavity Pair Clean Room

Liquid Helium Vessel

A Completed Cryounit

Trailer City

Somewhere inside the trailers

VARC Building

BEAMS Classroom

Jefferson Lab's Accelerator Site

Beam Switchyard

Beam Switchyard Extractor

Beam Switchyard Recombiner

Central Helium Liquefier

Cold Boxes

Helium Storage Tanks

Counting House

Experimental Hall Control Room

Personnel Accessway

East Arc Service Buildings

Ground Level

East Arc Service Buildings

Beam Enclosure Level

East Arc

Experimental Hall A

Hall A Truck Ramp

Hall A Spectrometers

Electron Spectrometer

Extras!

Dome Scaffolding (05/91)

Concrete Form Boards (05/91)

Dome Concrete Pour (06/91)

Experimental Hall B

Hall B Truck Ramp

Large Acceptance Spectrometer

CLAS Superconducting Magnets

Climb the Scaffolding!

Extras!

Beam Dump Walls (04/91)

Experimental Hall C

Hall C Truck Ramp

Accelerator Tunnel View

High Momentum Spectrometer

Under the Beamline

Extras!

Post-Tensioning Cables (09/91)

Free Electron Laser Building

Top Floor

Control Room

RF Gallery

User Lab

Beam Enclosure Level

Injector

Linear Accelerator

Wiggler Magnet

Return Line

Injector Service Building

Ground Level

Injector Service Building

Beam Enclosure Level

Injector

Injector Cryomodule

Extras!

Tunnel Construction (11/88)

Machine Control Center

Control Room

Machine Status Screens

Last 8 Hours Graph

Personnel Safety System

Free Electron Laser Status

MCC Annex

Electronic Tech Shop

MCC Annex II

North Access Building

Ground Level

North Access Hatchway

Beam Enclosure Level

North Access Receiving Area

North Linear Accelerator Service Building

Ground Level

North LINAC Service Building

Beam Enclosure Level

North Linear Accelerator

Extras!

Tunnel Construction (03/89)

North Recombiner

North Spreader

Physics Storage Building

Storage Area

South Access Building

Ground Level

South Access Hatchway

Beam Enclosure Level

South Access Receiving Area

South Extractor

South Extractor - View 2

South Linear Accelerator Service Building

Ground Level

South LINAC Service Building

Beam Enclosure Level

South Linear Accelerator

Extras!

Tunnel Construction (03/90)

South Recombiner

South Spreader

Virginia Power Substation

West Arc Service Buildings

Ground Level

West Arc Service Buildings

Beam Enclosure Level

West Arc