Applied Research Center
1st Floor
Conference Room
Library
User Lab
7th Floor
Check out the view!
Extras!
Construction Photo (08/95)
Construction Photo (10/96)
Construction Photo (10/97)
Ribbon Cutting Ceremony (05/98)
Governor Gilmore (05/98)
Library Space (09/98)
Empty 7th Floor (09/98)
CEBAF Center
Cafeteria
Cavity Display
CEBAF Center Auditorium
Eating Area
User/International Liaison Office
2nd Floor
Computer Center
Director's Office
Construction Photo (10/88)
Experimental Equipment Laboratory
Detector Assembly
Calorimeter Assembly Area
Detector Assembly Clean Room
Drift Chamber Test Rig
Detector Storage Area
Residence Facility
The Great Room
A Guest Room
Test Lab
Cryomodule Assembly
Electron Beam Welder
Chemical Processing Room
Cavity Pair Clean Room
Liquid Helium Vessel
A Completed Cryounit
Trailer City
Somewhere inside the trailers
VARC Building
BEAMS Classroom
Beam Switchyard
Beam Switchyard Extractor
Beam Switchyard Recombiner
Central Helium Liquefier
Cold Boxes
Helium Storage Tanks
Counting House
Experimental Hall Control Room
Personnel Accessway
East Arc Service Buildings
Ground Level
Beam Enclosure Level
East Arc
Experimental Hall A
Hall A Truck Ramp
Hall A Spectrometers
Electron Spectrometer
Dome Scaffolding (05/91)
Concrete Form Boards (05/91)
Dome Concrete Pour (06/91)
Experimental Hall B
Hall B Truck Ramp
Large Acceptance Spectrometer
CLAS Superconducting Magnets
Climb the Scaffolding!
Beam Dump Walls (04/91)
Experimental Hall C
Hall C Truck Ramp
Accelerator Tunnel View
High Momentum Spectrometer
Under the Beamline
Post-Tensioning Cables (09/91)
Free Electron Laser Building
Top Floor
Control Room
RF Gallery
Injector
Linear Accelerator
Wiggler Magnet
Return Line
Injector Service Building
Injector Cryomodule
Tunnel Construction (11/88)
Machine Control Center
Machine Status Screens
Last 8 Hours Graph
Personnel Safety System
Free Electron Laser Status
MCC Annex
Electronic Tech Shop
MCC Annex II
North Access Building
North Access Hatchway
North Access Receiving Area
North Linear Accelerator Service Building
North LINAC Service Building
North Linear Accelerator
Tunnel Construction (03/89)
North Recombiner
North Spreader
Physics Storage Building
Storage Area
South Access Building
South Access Hatchway
South Access Receiving Area
South Extractor
South Extractor - View 2
South Linear Accelerator Service Building
South LINAC Service Building
South Linear Accelerator
Tunnel Construction (03/90)
South Recombiner
South Spreader
Virginia Power Substation
West Arc Service Buildings
West Arc
Citation and linking information
For questions about this page, please contact Steve Gagnon.